HVAC design and permit in Toronto

Request a Quote

Our Passion is design

how to design hvac system for a building

If you really want a bigger kitchen, is it smarter to add new space to the existing room? Or, would it be more efficient and cost effective to redesign the existing kitchen to maximize the space that you have? Removing walls and reconfiguring space can often gain the space you desire without adding on.

Our Professional HVAC Design Service Services

Heat loss and gain calculations includes examining not only above and below grade HLHG, air leakage and ventilation, but also the influence that people, appliances and window shading have on the system..

This is completely dependent on the type of project and project size. A sweeping, full-home renovation generally takes around 4-6 months. A renovation complete with an addition takes 5-7 months, and building a custom home takes just less than a year, beginning with a 1-2 month design process. Minor renovations obviously take less time. Bathrooms usually take 2 weeks, and full basements take 4-6 weeks. If either of these require additions, as well as renovations, we usually project that it will take around 2-4 months to build. Depending on the scope of the project, the design and planning phase can take anywhere from 4 weeks to 8 months… Even if this is a time consuming step, it is absolutely worthwhile.

Ventilation Design Summary is needed for your building permit application.

Heat recovery ventilation (HRV)  is an energy recovery ventilation system. These systems include equipment such as a heat recovery ventilator, heat-air exchanger, or air-to-air heat exchanger.

What we really do?

Architectural and Structural HVAC Design

hvac design toronto
building permit toronto

HVAC Drawing for Permit

We will provide you preliminary HVAC design with as many revision as necessary. After the design is confirm then we will move onto HVAC drawings set for our engineers to proceed with their work such as mechanical & structure design.

We will consolidate all the HVAC drawing done by us and the engineers as one cohesive permit drawing set for building permit submission. We will also prepare all the forms that are necessary for building permit application on client behalf.

After submitted the building permit application, our team will continue to follow up with the city to ensure there is no miscommunication between us and the city. This process will continue until the permit is approved.